Al Futtaim Elements Warehouse Waterproofing
Project Details
- CategoryMEP & Civil
- Completed2023 - 2024
- ClientAl Futtaim
- Scalehttps://www.alfuttaim.com/
Services Utilized
Discuss a Similar Project
Contact our engineering team to explore solutions for your facility.
Call +971 50 2223473info@zaventem.aeAl Futtaim Elements Warehouse Waterproofing
Project Challenge
- Severe water ingress issues in large-scale warehouses risking inventory damage.
- Working on expansive roof structures exposed to extreme summer temperatures.
- Executing the waterproofing without halting the 24/7 logistics operations inside the facility.
Project Solution
- Applied multi-layer polyurethane liquid membranes for seamless and highly durable roof protection.
- Repaired structural cracks using advanced epoxy injection methods before applying the final coats.
- Implemented phased execution schedules, coordinating closely with warehouse managers to minimize disruption.
Working Process
01
Surface Preparation
Thoroughly cleaned the roof and removed deteriorated existing insulation.
02
Crack Repair
Injected epoxy and sealed expansion joints to restore structural integrity.
03
Membrane Application
Applied primer and two coats of UV-resistant waterproofing liquid membrane.
04
Flood Testing
Conducted a 48-hour water flood test to guarantee zero leakage before final sign-off.