Skip to main content
Mon - Sat: 8:00 AM - 6:00 PM | Sunday: Closed
Al Futtaim Elements Warehouse Waterproofing

Al Futtaim Elements Warehouse Waterproofing

Project Details

  • CategoryMEP & Civil
  • Completed2023 - 2024
  • ClientAl Futtaim
  • Scalehttps://www.alfuttaim.com/

Discuss a Similar Project

Contact our engineering team to explore solutions for your facility.

Call +971 50 2223473info@zaventem.ae
Al Futtaim Elements Warehouse Waterproofing

Al Futtaim Elements Warehouse Waterproofing

Project Challenge

  • Severe water ingress issues in large-scale warehouses risking inventory damage.
  • Working on expansive roof structures exposed to extreme summer temperatures.
  • Executing the waterproofing without halting the 24/7 logistics operations inside the facility.

Project Solution

  • Applied multi-layer polyurethane liquid membranes for seamless and highly durable roof protection.
  • Repaired structural cracks using advanced epoxy injection methods before applying the final coats.
  • Implemented phased execution schedules, coordinating closely with warehouse managers to minimize disruption.

Working Process

01

Surface Preparation

Thoroughly cleaned the roof and removed deteriorated existing insulation.

02

Crack Repair

Injected epoxy and sealed expansion joints to restore structural integrity.

03

Membrane Application

Applied primer and two coats of UV-resistant waterproofing liquid membrane.

04

Flood Testing

Conducted a 48-hour water flood test to guarantee zero leakage before final sign-off.

Ready to engineer your future?

Partner with Dubai's premier technical services firm for your next major infrastructure project.

Start Your Project